DOE & DOSH Compliance CAR 2014 • LEV Reg 17
Book Audit
Malaysian Environmental • Occupational Statutory Compliance

Protect your plant from DOE stop-work orders & DOSH audit penalties.

Guaranteed < 5 mg/m³ stack particulate emissions (10x cleaner than Malaysian CAR 2014 limits) and 100% first-time LEV Regulation 17 inspection clearance. We safeguard your factory's operating license with custom-engineered industrial filtration.

Stack Particulate Matter < 5 mg/m³

Guaranteed stack emission (10x safety margin vs. DOE 50 mg/m³ ceiling).

LEV Regulation 17 100%

First-time inspection pass rate with DOSH Hygiene Technician 2 (HT2).

Rapid Notice Response 48 Hours

Urgent on-site engineering dispatch upon receiving DOE / DOSH notice.

Factory Shutdown Loss RM 0

Over 120+ Malaysian factories protected with zero unscheduled downtime.

Statutory Mandate & Enforcement

Navigating Malaysia’s two enforcement authorities.

Malaysian manufacturing plants face dual regulatory oversight. While DOE enforces external boundary emissions, DOSH/JKKP governs workplace indoor air hygiene. Superado provides synchronized compliance engineering for both.

Jabatan Alam Sekitar (DOE / JAS)

Environmental Quality Act 1974 (Akta 127) • CAR 2014
Statutory Risk: Section 31 Stop-Work Order Failure to maintain stack emission below 50 mg/m³ can result in immediate prohibition orders, plant closure, and fines up to RM 500,000 under the Environmental Quality Act.

DOE governs all chimney and exhaust discharge into the external atmosphere. Every fuel-burning installation, boiler, furnace, and industrial dust collector requires written notification and compliance testing.

  • Isokinetic Stack Sampling: Guaranteed compliance with MS 1596 / US EPA Method 5 protocol.
  • High-Temp Filter Media: PPS & PTFE membrane bags resistant to flue acid and spark carryover.
  • Written Notification (Peraturan 5): Technical design submission support for new emission stacks.
Book DOE Chimney Retrofit

Jabatan Keselamatan & Kesihatan (JKKP / DOSH)

OSHA 1994 (Act 514) • USECHH Regulations 2000
Mandatory Annual Audit: Regulation 17 Every Local Exhaust Ventilation (LEV) system must be examined and certified at least once every 12 months by a DOSH-registered Hygiene Technician 2 (HT2).

DOSH regulates internal factory air quality to protect workers from inhaling hazardous airborne dust, fumes, and chemical mists. Hood capture velocity and duct transport speed are strictly audited.

  • Capture Velocity Engineering: Minimum 0.5 – 1.0 m/s face velocity at operator breathing zones.
  • Duct Transport Speed: 18 – 22 m/s maintained to prevent hazardous dust settlement and duct fires.
  • Combustible Dust (ATEX): Anti-static conductive pleated cartridges with explosion-venting isolation.
Schedule DOSH LEV Inspection
Engineering Precision • MS 1596 / US EPA Method 1

The statutory 8D / 2D sampling standard explained.

DOE officers will reject chimney sampling if ports are installed in turbulent air zones. Here is how Superado designs compliant sampling elevations and maintains certified extraction.

Isokinetic Chimney Elevation & LEV Duct Architecture

Compliant with Malaysian Standard MS 1596 and DOE Industrial Air Quality Guidance Document.

Engineering Specification
FACTORY ROOF / GRADE ELEVATION 0.00 M < 5 mg/m³ CLEAN DISCHARGE 2D MIN. (TOP OUTLET) Disturbance buffer before exit 4" SAMPLING PORT 90° Dual Flanged Ports (MS 1596) DOE ACCREDITED PLATFORM Min 1.2m width + safety toe-board 8D MIN. (LAMINAR ZONE) 8 × Inside Diameter straight run Eliminates swirl & reverse turbulence INLET FROM BAGHOUSE D
DOE Isokinetic Sampling Platform on Chimney
DOE Isokinetic Sampling: Our certified technician conducting stack velocity profiling on a 25-meter chimney platform.
DOSH LEV Inspection with Digital Anemometer
DOSH LEV Regulation 17 Audit: Verifying hood capture velocity (min 0.75 m/s) at an industrial manufacturing workstation.
Guaranteed Audit Performance

DOE limits vs. Superado guaranteed emissions.

We don't just help you squeak by the legal threshold. Superado delivers an 8x to 15x safety margin, eliminating the risk of accidental non-compliance during sudden DOE spot checks.

Industrial Process / Application Malaysian Legal Limit (CAR 2014) Typical Generic Filter Media Superado Guaranteed Limit Compliance Safety Margin
Biomass & Wood Pellet Boilers
Akta 127 Schedule 2 (PM Emission)
150 mg/m³ 85 – 130 mg/m³ (At Risk) < 4.8 mg/m³ 31x Safety Buffer
Metal Casting & Iron Foundry Baghouses
Schedule 5 (Metallic Dust & Fumes)
50 mg/m³ 35 – 45 mg/m³ (High Risk) < 3.2 mg/m³ 15x Safety Buffer
Chemical Powder & Pharmaceutical Bagging
USECHH 2000 Permissible Exposure Limit
10 mg/m³ (TWA) 5 – 8 mg/m³ < 0.5 mg/m³ (HEPA) 20x Safety Buffer
Automotive & Industrial Spraybooths
DOE CAR 2014 (VOCs & Paint Overspray)
50 mg/m³ 28 – 42 mg/m³ < 2.5 mg/m³ 20x Safety Buffer
Commercial Kitchen Fume & Kitchen Exhaust
Local Council (DBKL/MBPJ) & DOE Smoke
Ringelmann Shade 1 Shade 2 (Odor Complaints) Shade 0 (100% Clear) Zero Visible Plume
Malaysian Plant Track Record

Proven outcomes across Selangor, N.S. & Johor.

Real factory situations where plant operations were threatened by regulatory notices. See how Superado engineered compliant solutions with zero downtime penalties.

Banting, Selangor • Palm Biomass Boiler

DOE Section 31 Stop-Work Order Revocation

The Problem: Plant was served an immediate Section 31 prohibition notice due to black smoke plume emitting > 180 mg/m³ PM after boiler tube expansion. Daily potential downtime loss: RM 45,000.
Superado Solution: Rapid retrofit within 10 days using custom PTFE membrane PPS filter bags and air-to-cloth ratio rebalancing from 1.6 to 1.1 m/min.
Verified Result: Stack emissions plummeted to 3.8 mg/m³ (97.8% reduction). Official DOE re-audit passed, notice lifted with RM 0 penalty.
Nilai, Negeri Sembilan • Iron Foundry

DOSH LEV Regulation 17 Compliance Overhaul

The Problem: Factory failed the annual DOSH LEV audit due to low capture velocity (< 0.25 m/s) at the metal shakeout station, triggering a formal DOSH Notice of Improvement.
Superado Solution: Redesigned aerodynamic extraction hoods and installed pleated spunbond polyester cartridges with timed reverse pulse-jet cleaning.
Verified Result: Capture velocity boosted to 0.82 m/s. 100% compliance certificate issued by DOSH-registered Hygiene Technician 2 (HT2).
Pasir Gudang, Johor • Chemical Processing

ATEX Combustible Powder Dust Collection

The Problem: Organic powder packing station produced static-prone fine dust, violating USECHH occupational exposure limits and creating an explosion hazard.
Superado Solution: Installed anti-static conductive filter cartridges (surface resistivity < 10⁶ ohm) paired with ATEX-certified flame isolation dampers.
Verified Result: 99.99% particulate capture down to 0.5 micron. Zero occupational health citations across 3 consecutive annual audits.
Emergency Factory Protocol

Received an official notice? What to do right now.

When DOE or DOSH issues a letter or notice of improvement, the statutory countdown begins immediately. Here is our rapid 14-day clearance roadmap.

Hour 0 – 24

1. Notice Review & Strategy

Send us a photo of the notice letter via WhatsApp. Our compliance engineers review the statutory citation and prepare an official liaison letter to JAS or JKKP.

Day 1 – 3

2. On-Site Physical Audit

We deploy our technical team to measure actual stack velocity, static pressure differential (ΔP), and LEV hood capture flow at your production lines.

Day 4 – 10

3. Turnkey Filter Retrofit

Custom fabrication and rapid delivery of PPS/PTFE bags or high-efficiency cartridges from our Selangor facility, installed during scheduled off-shift windows.

Day 11 – 14

4. Lab Test & Notice Clearance

Conduct third-party accredited stack testing (SAMM accredited lab), assemble the formal compliance report, and submit to DOE/DOSH for official notice closure.

Speak directly with our senior compliance engineers.

Whether you need a proactive LEV Regulation 17 annual audit or urgent remediation for a DOE notice, Superado delivers guaranteed statutory clearance.

Direct Phone Line:
+60 12-290 8272 / +60 3-8061 8888
Rapid WhatsApp Hotline:
+60 12-290 8272 (Guaranteed response within 30 mins)
Engineering Correspondence:
sales@superadofiltro.com / compliance@superadofiltro.com
Manufacturing & Engineering HQ:
Puchong Industrial Park, Selangor Darul Ehsan, Malaysia

Schedule Factory Audit